The Lead-Tin Recovery Project aims to extract tin metal from lead-tin alloys (Pb-Sn) and lead-tin-antimony alloys (Pb-Sn-Sb), which are byproducts of crude lead refining and lead-acid battery recovery. The lead-tin-antimony alloy serves as the core metallurgy component of this project.
Basic Design Parameters
|
Raw material chemical composition* |
Sn |
Sb |
Pb |
As |
Cu |
Ag |
PbO |
|
|
55~30% |
1~3% |
70~90% |
0.0069% |
0% |
800~1200PPM |
Unknown |
||
|
Product |
Refined Sn ingot |
1,500 t/a (Sn≥99.9%) |
||||||
|
Crude Pb ingot |
3,500t/a |
|||||||
|
Working days per year (day) |
3000 |
|||||||
|
Annually treatingn capacity (tpa) |
5,000 tons |
|||||||
|
Power |
Electricity |
AC 380V 50Hz |
||||||
*Note: This raw material is for reference. The client must give us the raw material chemical composition before making the project design.
Process
Technical and Economic Index
|
№ |
Item |
UOM |
QTY |
Remark |
| 1 |
Refined tin |
T/month |
125 |
|
| 2 |
Crude Lead Alloy |
T/month |
300 |
|
| 3 |
Al dust consumption |
kg/month |
300 |
Depend on raw material chemical composition |
| 4 |
Ammonium chloride consumption |
kg/month |
350 |
|
| 5 |
Sulfur (S) consumption |
kg/month |
580 |
|
| 6 |
Sawdust fluxing agent |
kg/month |
420 |
|
| 7 |
Sn metal recovery rate |
% |
98.5 |
|
| 8 |
Pb metal recovery rate |
% |
99 |
|
| 9 |
Water consumption for production |
m3/d |
30-40 |
30-40 m3/d water is a calculated value. The water is used as cooling water. The water should not be drained to sewer and could be reused after cooling. There should be a water pool in the plant for recycling and cooling the water. |
| 10 |
VDF rated power |
kW |
500 |
|
| 11 |
Crystallizer rated power |
kW |
140 |
|
| 12 |
Tilt agitator rated power |
kW |
19 |
|
| 13 |
Sn pump rated power |
kW |
3 |
|
| 14 |
Working days per year (day) |
Day/year |
300 |
Equipment List
|
No. |
Item |
Specification |
QTY |
Remark |
| 1 |
Lead-tin vacuum distillation furnace |
15T/Day |
1set |
|
| 2 |
Continuous crystallizer |
15T/Day |
1 set |
|
| 3 |
Sn ingot cast machine |
30 molds 10 ton per day |
1 set |
|
| 4 |
Impurity removing pot (With water cooling jacket) |
10Ton Q235 steel |
1 pcs |
Platforms are prepared by client as per our drawings. |
| 5 |
Holding pot |
10Ton Q235 steel |
1 pcs |
|
| 6 |
Casting pot |
10Ton Q235 steel |
1 set |
|
| 7 |
Agitator |
5.5 kW |
2 set |
|
| 8 |
Sn pump |
3 kW |
6 set |
3 operation, 3 standby |
Hot Tags: lead tin antimony vacuum distillation furnace, China lead tin antimony vacuum distillation furnace manufacturers, suppliers, factory, tin extraction process, Cadmium Vacuum Distillation Furnace, tin extraction from cassiterite, extraction of tin from cassiterite, tin extraction, Tin Refining Pot